FORT STOCKTON ISD NATATORIUM
As a part of a large renovation and expansion project at Fort Stockton High School, the district added a new Band Hall and Natatorium totaling 276,000 additional square feet. The natatorium contains a 50 meter competition pool and areas for spectators. Two (2) 30,000-cfm Dectron dehumidification units condition the space year-round for optimum temperature and humidity, as well as heating the pool water.
Owner: Fort Stockton High School Natatorium
Engineer: Parkhill, Smith & Cooper
General Contractor: Lee Lewis Construction
Mechanical Contractor: ARC Mechanical
Architect: Parkhill, Smith & Cooper
Products Used: Two (2) Dectron Pool Dehumidification Systems