Close Menu Close Menu

Natatoriums

Berkner Natatorium Renovation

Photo Coming Soon

Owner: Richardson ISD Engineer: Estes McClure Mechanical Contractor: Ranger Sheet Metal Products Used: Dectron Dehumidification Units and Dectron Make up Air units. Brief Description: A Dectron unit provides dehumidifies the air in the space and returns the heat lost in the normal evaporation process back to the pool during the refrigeration cycle.  Two Dectron MakeUp air units serve locker rooms providing 100% OA during unoccupied times and 100% RA during unoccupied times in order to save energy.

View Gallery

WINKIDS

winkids2

The sports & learning center for children offers an indoor swimming area for swim lessons & swim camp. MJEC provided a Dectron de-humidification system to insure a comfortable environment. MJEC partnered with Team Sheet Metal to design build this project.

View Gallery

UMHB Natatorium

umhb1

Dectron Model DS pool dehumidification unit installed in 2005 by Waco Systems and Engineered by RWB.

View Gallery

JJ Pearce Natatorium

JJ Pearce

Dectron System installed by United Mechanical.

View Gallery

Harris Methodist HEB Pool

heb3

This therapy pool at Harris Methodist Hospital in Hurst is served by a Dectron Dry-O-Tron unit. The Dectron unit dehumidifies the space and serves as the primary pool water heater.

View Gallery

Frisco ISD Natatorium

frisco-isd1

Two Dectron Model RS pool dehumidification units installed in 2003 by TD Industries, the Mechanical Engineer was GS Engineers.

View Gallery

Central Texas College Natatorium

ctc2

This Dectron installation was a 238 lb/hr Dehumidifier. It included energy recovery by means of a pool water heat exchanger. The installation was part of a performance contract executed by Johnson Controls.

View Gallery

McMillan James opens Houston office!
Read More