Close Menu Close Menu

K-12

Berkner Natatorium Renovation

Photo Coming Soon

Owner: Richardson ISD Engineer: Estes McClure Mechanical Contractor: Ranger Sheet Metal Products Used: Dectron Dehumidification Units and Dectron Make up Air units. Brief Description: A Dectron unit provides dehumidifies the air in the space and returns the heat lost in the normal evaporation process back to the pool during the refrigeration cycle.  Two Dectron MakeUp air units serve locker rooms providing 100% OA during unoccupied times and 100% RA during unoccupied times in order to save energy.

View Gallery

Northwest ISD Truett Wilson MS

Truett Middle School

Owner: Northwest ISD Engineer: Estes McClure and Associates Mechanical Contractor: 4Star Fabrication Products Used: ClimateMaster TT Heat pumps, Systecon Pump Skid, Paco Pumps, ConsERV Energy Recovery Units, Nexus hose kits Brief Description: A Systecon pump skid serves a geothermal field and the high-efficient TT Series heat pumps.  The engineer was allowed to design the field using a significant amount of diversity based on the packaged pump skid and advanced control algorithms. ConsERV energy recovery units temper the outside ventilation air recovering energy from the exhaust air from the spaces.

View Gallery

O.M. Roberts

Photo Coming Soon

Owner: Dallas ISD Engineer: Meza Engineering Mechanical Contractor: Yarbrough Mechanical Architect: NR2 Architects Products Used: ClimateMaster Water Source Heat Pumps (Model TS). Brief Description: This newest Dallas ISD school is named for former governor Oran Milo Roberts.  While currently in the submittable and pre-construction phase, this project is schedule to be completed in 2013.

View Gallery

Thelma Richardson Elementary

Photo Coming Soon

Owner: Dallas ISD Engineer: Basharkhah Engineering General Contractor: Satterfield & Pontikes/3i Mechanical Contractor: Yarbrough Mechanical Architect: BRW Architects Products Used: ClimateMaster Water Source Heat Pumps (Model TR). Brief Description: Named for former DISD teacher Thelma Elizabeth Page Richardson, this project is scheduled for opening when school begins in 2013.  As with all other new DISD schools in the 2008 Bond Program, Thelma Richardson Elementary will be heated and cooled by a geothermal heat pump system.  Once again McMillan James has teamed up with Yarbrough Mechanical to supply ClimateMaster TR heat pumps for occupant comfort.

View Gallery

Zan Wesley Holmes Middle School

Photo Coming Soon

Owner: Dallas ISD Engineer: Basharkhah Engineering General Contractor: Rogers-O'Brien Mechanical Contractor: Century Mechanical Architect: Perkins + Will Products Used: ConsERV Energy Recovery Ventilators and ClimateMaster Water Source Heat Pumps (Model TR). Brief Description: Named for  Rev. Zan Wesley Holmes Jr., this new 192,000 square foot Middle School opened in the Fall of 2012.  Among its myriad green technologies, the building utilizes a geothermal heat pump HVAC system.  McMillan James teamed with Century Mechanical to provide airside components that included ConsERV energy recovery ventilators and ClimateMaster TS indoor units.

View Gallery

Mitchell Elementary School

Photo Coming Soon

Owner: Plano ISD Engineer: Image Engineering Group General Contractor: Cadence McShane Mechanical Contractor: Yarbrough Mechanical Architect: SHW Group Products Used: ClimateMaster Water Source Heat Pumps (Model TR w/ ECM motors). Brief Description: For its first geothermal heat pump project, Plano ISD chose the renovation of Mitchell Elementary School.  Taking place in the summer of 2012, the district renovated the entire school and added nearly 31,000 extra square feet.  Yarbrough Mechanical installed 74 ClimateMaster TR heat pumps throughout the old and new portions of the school.

View Gallery

Waxahachie ISD

waxahachie1

Three schools designed by Estes McClure & Assoc and installed by RJ Moore Mechanical feature ClimateMaster geothermal heat pumps and Munters De-humidification units for outside air pre-treatment.

View Gallery

Nolan Middle School

Nolan Middle School

Munters Model HCU packaged desiccant outside air units with post heat.

View Gallery

Ennis Intermediate School

ennis2

Installed in 2009, this project has nearly 100 ClimateMaster geothermal water source heat pumps & Munters desiccant de-humidification units used for makeup air. Berger Engineering was the mechanical contractor & Estes McLure the Mechanical Engineer.

View Gallery

McMillan James opens Houston office!
Read More